Sennheiser EM 100 G2 Service Manual Page 14

  • Download
  • Add to my manuals
  • Print
  • Page
    / 32
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 13
EM 100 G2, EM 300 G2, EM 500 G2
08/2004 14/32
5.3 Test table
Sequence Type of measure-
ment/adjustment
Signal input Settings Measuring
point/test
point
Required
value
Remarks
1 Visual inspection
1.1 Jack socket PHONES
(only EM 500 G2)
–– Contacts are
not twisted, no
hairline cracks
at the solder
points, no
mechanical
damage
1.2 Volume control
(only EM 500 G2)
–– See 1.1
1.3 왖왔, SET,
POWER/ON buttons
–– See 1.1
1.4 DC socket, DC IN
–– See 1.1
1.5 XLR socket
–– See 1.1
1.6 Jack socket
–– See 1.1
1.7 RJ45 DATA socket
–– See 1.1
1.8 BNC sockets
–– See 1.1
1.9 Monitoring of all
display elements
+12V
DC
at DC socket "POWER" = ON –– Monitoring of
all display
segments
1.10 Monitoring of the il-
luminated 왖왔, SET,
ON buttons
(not EM 100 G2)
See 1.9 See 1.9
––
2 Mainboard: current and voltage measurement
2.1 Standby See 1.9 "POWER" = Off
"VOL" = min. (R1)
"AF level" = max.
50mA Set laboratory
power supply
unit current
limiter to
I
ON
= 1A
2.2 Current consumpti-
on during operation
See 1.9 "POWER" = On
"VOL" = min. (R1)
"AF level" = max.
200mA See 2.1
2.3 Commissioning See 1.9 VOL = min. (R1)
AF LEVEL = max.
––
2.4 Operating voltage
(+12V
DC
)
See 1.9 POWER = On Mainboard,
solder side:
TP209 (+)
TP208 (-)
+12V
DC
2.5 Operating voltage
(+6V
DD
)
See 1.9 See 2.4 TP226/ GND +5.8V to
+6.2V
2.6 Operating voltage
(+5V
CC
)
See 1.9 See 2.4 TP231/ GND +4.8V to
+5.2V
2.7 Operating voltage
(+5V
SW
)
See 1.9 See 2.4 TP233/ GND +4.8V to
+5.2V
2.8 Operating voltage
(+6V
SW
)
See 1.9 See 2.4 TP229/ GND +5.8V to
+6.2V
Page view 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 31 32

Comments to this Manuals

No comments