Sennheiser SI 234 - ANNEXE 802 Operations Instructions Page 171

  • Download
  • Add to my manuals
  • Print
  • Page
    / 440
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 170
DA 42 NG AFM
Normal Operating
Procedures
Doc. No. 7.01.16-E Rev. 3 01-Apr-2014 Page 4A - 13
j) Nacelle underside ..................... check for excessive
contamination particularly by oil,
fuel, and other fluids
k) Auxiliary tank drain (if installed) .......... drain off to check for water and
sediment (drain until no water
comes out) / visual inspection
l) Auxiliary tank filler (if installed) ........... visual inspection, tank filler closed
3. Left wing:
a) Entire wing surface .................... visual inspection
b) Vortex generators ..................... undamaged, 4 pieces, clean
c) Tank air outlet on lower surface .......... visual inspection
d) Tank drain/tank air inlet ................ drain off to check for water and
sediment (drain until no water
comes out)/visual inspection
e) Openings on lower surface .............. check for foreign objects and for
traces of fuel (if tank is full, fuel
may spill over through the tank
vent)
f) Stall warn device...................... visual inspection
g) Tank filler ........................... visual inspection, check closed
h) Pitot probe .......................... clean, orifices clear, cover
removed, no deformation
i) Wing tip............................. visual inspection
j) Static dischargers ..................... visual inspection
k) Position light, strobe light (ACL) .......... visual inspection
CONTINUED
Page view 170
1 2 ... 166 167 168 169 170 171 172 173 174 175 176 ... 439 440

Comments to this Manuals

No comments